July 10 - It has been a little while since we have updated you on the progress currently taking place on the iconic Nemesis roller coaster at Alton Towers. We still await the installation of the helix and corkscrew and track for the Zero-G roll appears to be waiting in the car park on the trucks in preparation for this. This new section of track was installed last week, we also get to see the Stall and new supports appear to have gone in place near to the station. July 23 - In the latest construction update from Theme Park Worldwide on July 20, we get to see that the iconic loop has now gone into place on Nemesis at Alton Towers and it certainly looks very impressive. We will continue to bring you updates on the Nemesis retracking as it progresses at Alton Towers. We still eagerly await news regarding the colour of the trains. New wooden cut outs and a wooden structure has appeared on site which could be for the theming of the station.Ī lot of pressure washing is happening on site including the extensive rock work. We are expecting significant work to be done and we will continue to update you on this. Part of the monster has started to be painted black. We are still waiting for the first corkscrew to be installed as well as the helix.Ĭhanges are being made to the station, scaffolding has been erected and the eyes have been removed from the monster. It now looks like the inversion is actually made up from three different track segments, where before it was constructed of two longer segments.Ī primer coat has now been applied to the lift hill in preparation for being painted black with the red veins. It has also been noted that the vertical loop has thicker spine sections to connect to the supports, this is assumed to be to made it stronger so it lasts longer. It appears to have slightly different profiling and appears to be more compact than before so you won't spend as much time on your back. You can get great views of this from the ground level and observation platform. UPDATE July 27 - In the latest construction update posted to YouTube by Theme Park Worldwide, we can see that the Zero-G roll has now been installed.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |